Lots of good progress again this week.  The roof is finished, apart from the ridge line covers, more windows have been installed, the electrician is in full swing with the first fix and the soffit panels of the roof have been installed.

The finished roof looks great
The panels along the roof valleys have been trimmed neatly

The lower level dining room windows have been installed

The high level kitchen windows have been installed

The high level windows along the hallway have been installed

The soffit panels along the east facade have been installed

and along the north facade

Frameworks for the bulkhead either side of the chimney

First fix wiring

We have now measured the sizes of the upper level windows in the lounge so that Westcoast Windows can start their fabrication

Outside of the dining room window

North facade - with the soffit complete the canopy roof over the terrace looks fantastic

The east facade of the house - the roof profile is just amazing