| The concrete infill has been poured in the east retaining wall hollow concrete blocks |
| Looking along the east retaining wall where the rainwater tanks will be located |
| The walls for the entrance steps and the south side of the house are also finished |
| The concrete infill has been poured in the east retaining wall hollow concrete blocks |
| Looking along the east retaining wall where the rainwater tanks will be located |
| The walls for the entrance steps and the south side of the house are also finished |
No comments:
Post a Comment