Saturday, November 27, 2010

Photos from week starting 22nd November

Compare these photos with last week and you can see what can be achieved if it doesn't rain for a week.  Now that summer is really here we are hoping that progress will really accelerate.

The ground slab is being prepared for the concrete pour
The black plastic sheet acts as a damp proof membrane.  The reinforcement is under the line of the load bearing walls
Now that the east retaining wall has been backfilled we can see the full footprint of the house
The walls of the swimming pool are also being prepared by fixing the geotextile material and drainage sheets
All the underground drainage pipes have been installed
We got our car back from the garage as well.  Although it was covered by insurance it still cost us $970!