Preparations are being made for the footings of the uphill retaining wall |
The location of the rear wall of the garage |
Location of the rear staircase footing |
The fully excavated swimming pool |
Fill has been placed on the downhill side of the house |
The area where the downhill retaining wall will be located |
Excavated material from the swimming pool has been moved to the east side of the site |
The driveway has now been covered in crushed concrete |
Entrance to the site |
No comments:
Post a Comment