| Preparations are being made for the footings of the uphill retaining wall |
| The location of the rear wall of the garage |
| Location of the rear staircase footing |
| The fully excavated swimming pool |
| Fill has been placed on the downhill side of the house |
| The area where the downhill retaining wall will be located |
| Excavated material from the swimming pool has been moved to the east side of the site |
| The driveway has now been covered in crushed concrete |
| Entrance to the site |