| Edge boards for the garage foundations |
| Excavation for the house drainage pipes has started |
| Preparation for the retaining wall foundations |
| Fabrication of reinforcement for the retaining wall foundations |
| The east side of the house is now ready for the piling to start |
| The foundations around the edge of the swimming pool have now been excavated |
No comments:
Post a Comment