| The timber deck walkway |
| The next jobs are to fix the handrail and to install the rainwater tanks |
| The completed pergola above the terrace |
| At the moment the blades are in the full upright position. When we have power we will be able to adjust them from this position to fully closed |
| The installation work is really neat |
| The fence posts at the end of the pool terrace have been installed |
| Ceiling lights in the laundry |
| Close up of one of the LED downlighters |
| The LED strip light in the bathroom operating. It looks awesome |
| The first plank for the timber floor has been laid along the corridor |
| The planks in Peter's bedroom have been cut to length and are ready to be laid |
| The hallway planks are ready to be laid. Hopefully next week this same shot will show a finished floor |
| The lift top box in the bathroom is really neat |
| Toilet and handbasin in the WC |
| This is the first time that I have seen both doors in the lounge open. You can see how the pergola provides shade internally |
| Spring must be here because I came across this water dragon having a sun bathe |