The walls of the garage are at about half full height |
The swimming pool walls have been cast and the retaining walls along the east and north sides have been built |
They are working on the water proofing behind the west retaining wall |
And at last the east side of the site is being regraded and the top soil replaced |
No comments:
Post a Comment