This is looking through the study window across the still wet Tung oil |
The balustrade wires and handrail have been fitted around the courtyard |
Completed balustrade along the east terrace |
Balustrade around the north terrace |
The water pump and cartridge filter have been installed |
The manifold pipe that connects the rainwater tanks to the pump |
The valve between the tank and the manifold. The hole in the slab is to enable the tank overflow pipe to be installed under the slab |
Our 'space ship' light has been re-installed at the correct height |
The island bench light has also been installed at the correct height |
The triple downlight unit has been installed in the lounge |
The lights have been fitted on steps from the car park to the east terrace |
The light has been installed on the column outside the garage (I am really looking forward to seeing this working) |
The downpipe has been installed from the louvre span unit |
Matt wasn't happy with the joints between the blue boards on the south facade and has resealed them |
The washing line posts have been installed on the terrace next to the vegetable beds |
The rework of the landing at the top of the courtyard steps is nearly finished |
View of the east facade. The only thing missing now are the three roof downpipes (they should be fitted next week) |
View from the north east. It looks fantastic |