Ian is away this week - so I'm filling in!
Not much happening inside the house this week except for finishing off the tiling - here's how the bathroom floor turned out.
Matt (our builder) inserted ply into the spaces where we're waiting for the next lot of windows from Sweden and the front door from the UK - so that the house is now 'sealed':
The bulk of the action though, was outside - with work on the small terraces at the back (west side) of the house:
... and the driveway:
... and retaining walls at the front (east side):
No comments:
Post a Comment