Saturday, April 9, 2011

Photos from week starting 4th April

There has been a real leap forward in the roof construction this week now that all the main ridge and valley beams are in place.

Other news is that the ship carrying our windows arrives in Sydney tomorrow and the container should be delivered within about a week.  There have been lots of issues to resolve around this, including organising customs clearance, transport and a place to unload the container (the truck and container are too large to get to the site so we are going to use an industrial unit belonging to a friend of the builder on an industrial estate at Somersby Falls next to the freeway).

The roof beams are on over the garage

The roof beams over the main bedroom

The main bedroom roof structure showing the double valley

Looking south along the east facade

Steel cleat used to connect the roof beams

View south over the west side of the house

Beams for the lower level roof on the west side of the house

Looking at the wall between the kitchen and the laundry