Other news is that the ship carrying our windows arrives in Sydney tomorrow and the container should be delivered within about a week. There have been lots of issues to resolve around this, including organising customs clearance, transport and a place to unload the container (the truck and container are too large to get to the site so we are going to use an industrial unit belonging to a friend of the builder on an industrial estate at Somersby Falls next to the freeway).
| The roof beams are on over the garage |
| The roof beams over the main bedroom |
| The main bedroom roof structure showing the double valley |
| Looking south along the east facade |
| Steel cleat used to connect the roof beams |
| View south over the west side of the house |
| Beams for the lower level roof on the west side of the house |
| Looking at the wall between the kitchen and the laundry |