| The back walls of the garage are now at full height. The garage will be high enough to park a truck in there. |
| The inside walls of the bathroom and toilet are now finished |
| The outside skin is nearly there. You can see the insulation fixed to the inner skin |
| The south end walls |
| Poles pegged into the ground to prevent erosion |
No comments:
Post a Comment