| Looking along the east retaining wall |
| The wall is currently about 3/4 of its final height |
| Walls of the equipment room |
| Not much change on the rest of the site. Hopefully they will start on the swimming pool walls next |
| Looking along the east retaining wall |
| The wall is currently about 3/4 of its final height |
| Walls of the equipment room |
| Not much change on the rest of the site. Hopefully they will start on the swimming pool walls next |
No comments:
Post a Comment