Looking along the east retaining wall |
The wall is currently about 3/4 of its final height |
Walls of the equipment room |
Not much change on the rest of the site. Hopefully they will start on the swimming pool walls next |
Looking along the east retaining wall |
The wall is currently about 3/4 of its final height |
Walls of the equipment room |
Not much change on the rest of the site. Hopefully they will start on the swimming pool walls next |
You can see the tops of the poured piles |
Pile and east retaining wall footing |
Footing for the equipment room |
The hollow concrete blocks for the retaining walls have been delivered |
A lizard sun bathing next to our driveway |
Pile holes with the boring machine |
More piles holes |
Even more pile holes |
And even more. Who said that bored piles were boring? |
The base slab of the garage has been poured |
Garage base with starter bars for the retaining walls |
Drainage pipes have all been installed |
Piles for the east retaining wall have been poured |
Piles for swimming pool equipment room |
The base of the swimming pool has been poured |