| Looking along the east retaining wall | 
| The wall is currently about 3/4 of its final height | 
| Walls of the equipment room | 
| Not much change on the rest of the site. Hopefully they will start on the swimming pool walls next | 
| Looking along the east retaining wall | 
| The wall is currently about 3/4 of its final height | 
| Walls of the equipment room | 
| Not much change on the rest of the site. Hopefully they will start on the swimming pool walls next | 
| You can see the tops of the poured piles | 
| Pile and east retaining wall footing | 
| Footing for the equipment room | 
| The hollow concrete blocks for the retaining walls have been delivered | 
| A lizard sun bathing next to our driveway | 
| Pile holes with the boring machine | 
| More piles holes | 
| Even more pile holes | 
| And even more. Who said that bored piles were boring? | 
| The base slab of the garage has been poured | 
| Garage base with starter bars for the retaining walls | 
| Drainage pipes have all been installed | 
| Piles for the east retaining wall have been poured | 
| Piles for swimming pool equipment room | 
| The base of the swimming pool has been poured |