Unfortunately it rained for most of the week and as a consequence there was not much progress.
Top soil removed along east boundary of the site. This area will be built up with excavated clay from the house and then the topsoil relaid |
Looking up the driveway. We have agreed with Matt to excavate the top soil along the driveway as it is not strong enough to support the drive sub-base material |
Looking down the driveway. Very muddy. |
Excavation for the garage |
Excavation and fill for the fire truck turning circle |