| The ground slab is being prepared for the concrete pour |
| The black plastic sheet acts as a damp proof membrane. The reinforcement is under the line of the load bearing walls |
| Now that the east retaining wall has been backfilled we can see the full footprint of the house |
| The walls of the swimming pool are also being prepared by fixing the geotextile material and drainage sheets |
| All the underground drainage pipes have been installed |
| We got our car back from the garage as well. Although it was covered by insurance it still cost us $970! |