The ground slab is being prepared for the concrete pour |
The black plastic sheet acts as a damp proof membrane. The reinforcement is under the line of the load bearing walls |
Now that the east retaining wall has been backfilled we can see the full footprint of the house |
The walls of the swimming pool are also being prepared by fixing the geotextile material and drainage sheets |
All the underground drainage pipes have been installed |
We got our car back from the garage as well. Although it was covered by insurance it still cost us $970! |